Get ready the soil by raking the realm free of stones and clods. A Bobcat or tractor can be needed for large Employment. Will not compact. If working with fertilizer, increase it into the soil right before grading. Positioning: Position the coir logs with the waterline or together the edge https://arthurpjuir.dsiblogger.com/67553604/about-coir-entrance-matting