Insert the panel in the wall-mounted track and fasten it with the delivered screws. Add protective silicone into the pre-drilled holes to reinforce the water seal. Maintain panels within their original packaging right up until needed and store them in a vertical situation at a slight angle (10-fifteen levels) working https://nebula-directory.com/listings606489/the-5-second-trick-for-shower-door-installation-in-newton-ma